Core System Architecture Part 118 — Anonymous Network Physical Disaster Preparedness, Fire/Flood/Earthquake Response, Site Evacuation, Asset Salvage, Emergency Logistics & Privacy-Preserving Facility Continuity Architecture
SIAR — Secure, Local-First, Multi-Transport Communication Platform
Series: Core System Architecture
Part: 118
Status: Architecture specification
Primary language: Rust
Builds on: Core System Architecture Parts 50, 70–71, 94–100, 104–107, 110, 114–117
Primary purpose: define SIAR's physical-disaster and facility-continuity architecture for fire, flood, earthquake, severe weather, structural failure, environmental emergency, site evacuation, emergency shutdown, asset salvage, crisis logistics, temporary capacity, custody preservation, recovery sequencing, site requalification, and privacy-preserving continuity operations.
1. Purpose
Physical disasters can invalidate assumptions across:
power
cooling
network
hardware
access
staffing
transportation
regional availability
A robust platform must answer:
When should a site evacuate?
When should systems shut down?
What must fail over first?
Which assets are salvageable?
How are damaged devices handled securely?
How are replacement systems brought online?
How do we preserve chain of custody in a crisis?
When can a site be trusted again?
The governing principle is:
SIAR physical continuity should prioritize human safety, preserve system security and privacy, fail over predictably, salvage only verifiable assets, and restore service through explicit requalification rather than ad hoc emergency exceptions.
2. Architectural Position
PHYSICAL HAZARD
│
▼
DISASTER CLASSIFICATION
│
┌────────┼────────┐
│ │ │
LOCAL SITE REGIONAL
│ │ │
└────────┼────────┘
▼
EMERGENCY STATE
│
┌────────────┼────────────┐
│ │ │
EVACUATE FAILOVER SHUTDOWN
│ │ │
└────────────┼────────────┘
▼
SALVAGE / REBUILD
│
▼
SITE REQUALIFICATION
3. Core Separation
Keep distinct:
human evacuation
technical evacuation
failover
shutdown
salvage
recovery
requalification
4. Non-Goals
Part 118 does not create:
person tracking during disasters
employee attendance scoring
unsafe remote operation during evacuation
security bypass justified by emergency
automatic reuse of physically exposed hardware
5. Disaster Class
#![allow(unused)] fn main() { pub enum PhysicalDisasterClass { Fire, Flood, Earthquake, SevereWeather, StructuralFailure, UtilityFailure, HazardousEnvironment, RegionalEmergency, Unknown, } }
6. Disaster Severity
#![allow(unused)] fn main() { pub enum DisasterSeverity { Advisory, Localized, Serious, Critical, Catastrophic, } }
7. Severity Is Technical/Operational
Not media classification.
8. Hard rule.
9. Hazard Scope
#![allow(unused)] fn main() { pub enum HazardScope { Rack(RackId), Zone(FacilityZoneId), Site(PhysicalSiteId), Region(RegionId), } }
10. No Person Scope
Hard rule.
11. Hazard Event
#![allow(unused)] fn main() { pub struct HazardEvent { pub class: PhysicalDisasterClass, pub severity: DisasterSeverity, pub scope: HazardScope, pub observed_at: CoarseTimestamp, pub evidence: Vec<HazardEvidenceRef>, } }
12. Hazard Evidence
Possible sources:
facility sensors
building alarm
site operator confirmation
utility/provider notice
regional emergency feed
13. No Single Unverified Signal For Catastrophic Action Where Avoidable
Hard rule.
14. Disaster Confidence
#![allow(unused)] fn main() { pub enum DisasterConfidence { Low, Medium, High, Confirmed, } }
15. Unknown ≠ Safe
Hard rule.
16. Facility Emergency State
#![allow(unused)] fn main() { pub enum FacilityEmergencyState { Normal, Alert, Degraded, Evacuating, Evacuated, Isolated, Recovering, Requalifying, } }
17. No Evacuated→Normal Direct
Hard rule.
18. Emergency State Transition
Normal
↓
Alert
↓
Degraded
↓
Evacuating
↓
Evacuated
↓
Recovering
↓
Requalifying
↓
Normal
19. Emergency Shortcuts
Catastrophic events may go:
Normal → Evacuating
or:
Normal → Isolated
20. Hard rule.
21. Human Safety Precedence
Human life and emergency egress override equipment preservation.
22. Hard Rule
No technical policy may delay evacuation required by life-safety systems.
23. Human Evacuation vs Technical Drain
Separate.
24. If humans must evacuate immediately:
automatic safe technical actions continue
manual tasks stop
25. Hard rule.
26. Emergency Technical Actions
#![allow(unused)] fn main() { pub enum DisasterSafetyAction { FreezePlacement, StopNewAdmission, DrainRack(RackId), DrainZone(FacilityZoneId), DrainSite(PhysicalSiteId), FailoverService(ServiceId), GracefulShutdownSite(PhysicalSiteId), IsolateNetworkZone(FacilityZoneId), } }
27. No Generic Shell Action
Hard rule.
28. Action Precedence
life safety
> security containment
> data integrity
> service continuity
> asset preservation
29. Hard rule.
30. Fire Response
Fire may require:
immediate evacuation
power isolation
fire suppression
network isolation
site failover
31. Fire State
#![allow(unused)] fn main() { pub enum FireState { Suspected, Confirmed, SuppressionActive, Contained, Cleared, } }
32. Confirmed Fire
Triggers evacuation according to site safety design.
33. Hard rule.
34. Fire Suppression Integration
Facility system is authoritative.
35. SIAR consumes coarse state:
alarm
suppression active
zone affected
36. No attempt to override certified fire system logic.
37. Hard rule.
38. Power During Fire
May require:
controlled shutdown
power cut to affected zone
39. Safety first.
40. Hard rule.
41. Flood Response
Flood/water hazards can affect:
power
cooling
floor cabling
storage
hardware
42. Flood State
#![allow(unused)] fn main() { pub enum FloodState { LeakDetected, LocalizedWater, RisingWater, SiteFlood, Receding, Cleared, } }
43. Water + Power
High-risk combination.
44. Hard rule.
45. Flood Safety Actions
Possible:
power isolate affected zone
drain workloads
protect backup media
fail over site
46. No technician intervention in unsafe electrical environment.
47. Hard rule.
48. Earthquake Response
Earthquake can invalidate:
rack stability
power
cooling
network cabling
building structure
49. Seismic Event
#![allow(unused)] fn main() { pub struct SeismicEvent { pub scope: HazardScope, pub severity: DisasterSeverity, pub structural_inspection_required: bool, } }
50. Post-Seismic Requalification
Required before trust.
51. Hard rule.
52. Automatic Actions After Significant Seismic Event
Possible:
freeze new placement
stop risky maintenance
drain if facility alarms trigger
mark site Requalifying
53. Hard rule.
54. Severe Weather
Examples:
cyclone
hurricane
blizzard
heatwave
dust storm
55. Preparation Window
Can allow preemptive:
fuel check
backup verification
staff reduction
capacity shift
site drain
56. Hard rule.
57. Structural Failure
Examples:
roof damage
floor failure
rack collapse
building damage
58. Immediate affected-zone isolation.
59. Hard rule.
60. Utility Failure
Long-duration power/water/telecom loss.
61. Integrates Part 116 power architecture.
62. Hard rule.
63. Hazardous Environment
Examples:
smoke contamination
chemical release
extreme heat
unsafe air
64. Human safety remains authoritative.
65. Hard rule.
66. Regional Emergency
May impact multiple sites simultaneously.
67. Examples:
regional blackout
major flood
earthquake
war/civil emergency
carrier outage
68. Avoid assuming regional independence during shared disaster.
69. Part 110 correlation model applies.
70. Hard rule.
71. Site Evacuation Trigger
#![allow(unused)] fn main() { pub enum EvacuationTrigger { LifeSafetyAlarm, ConfirmedFire, StructuralRisk, FloodRisk, HazardousEnvironment, AuthorityOrder, FacilityManagerDecision, } }
72. Trigger Is Not Delayed For Service Availability
Hard rule.
73. Technical Evacuation Plan
#![allow(unused)] fn main() { pub struct TechnicalEvacuationPlan { pub site: PhysicalSiteId, pub drain_order: Vec<ServiceId>, pub shutdown_order: Vec<HardwareAssetId>, pub failover_targets: Vec<RegionId>, } }
74. Precomputed
Hard rule.
75. No Crisis-Time Improvisation Baseline
Hard rule.
76. Service Drain Order
Suggested precedence:
analytics
background
bulk
optional
interactive
core messaging
control/security last
77. Hard rule.
78. Shutdown Order
Respect:
data integrity
quorum
storage
network dependencies
79. Hard rule.
80. Emergency Shutdown
If graceful drain impossible:
protect transactional integrity where possible
stop writes before abrupt storage loss
81. Hard rule.
82. Site Failover
Part 100.
83. Failover Eligibility
Target must satisfy:
security
privacy
residency
capacity
trust
84. Hard rule.
85. No Nearest-Site Fallback If Noncompliant
Hard rule.
86. Emergency Capacity Reserve
Part 101/110.
87. Disaster failover consumes protected reserve.
88. Hard rule.
89. Site Isolation
When physical compromise suspected:
network isolate
credential restrict
stop sensitive workloads
preserve evidence
90. Hard rule.
91. Disaster Communication
Internal emergency notifications must contain:
site
hazard class
operational state
required action
92. No unnecessary worker location detail.
93. Hard rule.
94. Emergency Coordination
Roles:
#![allow(unused)] fn main() { pub enum DisasterRole { SiteIncidentLead, FacilitiesLead, InfrastructureLead, SecurityLead, LogisticsLead, RecoveryLead, } }
95. Scoped Roles
Hard rule.
96. No Universal Emergency Superuser
Hard rule.
97. Emergency Authority
Time-bounded.
98. Hard rule.
99. Disaster Runbook
Must include:
evacuation
technical drain
failover
shutdown
salvage
logistics
recovery
requalification
100. Versioned.
101. Hard rule.
102. Preparedness
Preparation includes:
drills
spare inventory
alternate site
fuel
backup
emergency contacts
transport vendors
103. Hard rule.
104. Disaster Exercise
Types:
#![allow(unused)] fn main() { pub enum DisasterExerciseType { Tabletop, Simulation, ControlledFailover, FullSiteDrill, } }
105. Human Evacuation Drill
Handled by facility safety authorities.
106. SIAR verifies technical continuity behavior.
107. Hard rule.
108. Exercise Metrics
detection time
evacuation trigger time
technical drain time
failover time
recovery time
evidence completeness
109. No employee scoring.
110. Hard rule.
111. Disaster Readiness State
#![allow(unused)] fn main() { pub enum DisasterReadinessState { Ready, Degraded, NotReady, Unknown, } }
112. Unknown ≠ Ready
Hard rule.
113. Preparedness Checks
runbook current
failover target ready
backup verified
spares ready
fuel/power ready
site contacts valid
114. Hard rule.
115. Asset Salvage
Post-disaster assets are not trusted automatically.
116. Salvage State
#![allow(unused)] fn main() { pub enum SalvageState { Unknown, UnsafeToInspect, AwaitingInspection, Recoverable, Quarantined, SanitizationRequired, DestroyRequired, Requalified, } }
117. No Recoverable→Trusted Direct
Hard rule.
118. Salvage Inspection
Check:
physical damage
water exposure
smoke contamination
electrical damage
tamper state
storage integrity
firmware/boot measurements
119. Hard rule.
120. Salvage Class
#![allow(unused)] fn main() { pub enum SalvageClass { ReusableAfterInspection, ReusableAfterRepair, DataRecoveryOnly, DestructionRequired, } }
121. High-Value Crypto Hardware
More conservative.
122. Hard rule.
123. Water-Exposed Hardware
Requires:
power isolation
inspection
controlled drying/cleaning
electrical validation
re-attestation
124. No immediate power-on.
125. Hard rule.
126. Smoke-Exposed Hardware
May require cleaning/replacement.
127. Hard rule.
128. Seismic-Damaged Hardware
Check:
mounts
connectors
drives
board damage
rack stability
129. Hard rule.
130. Salvage Chain of Custody
Part 117.
131. Disaster does not suspend custody rules.
132. Hard rule.
133. Emergency Asset Movement
May simplify approvals but preserves:
asset ID
movement ID
destination
custodian scope
134. Hard rule.
135. Temporary Storage
Damaged/salvaged devices require secure holding area.
136. Hard rule.
137. Damaged Storage Media
Treat as sensitive until sanitized/destroyed.
138. Hard rule.
139. Emergency Data Recovery
If device damaged:
recover only within approved secure environment
140. No uncontrolled vendor data recovery.
141. Hard rule.
142. Disaster Logistics
Need movement of:
spares
fuel
network equipment
storage
replacement servers
143. Logistics Plan
#![allow(unused)] fn main() { pub struct EmergencyLogisticsPlan { pub site: PhysicalSiteId, pub required_assets: Vec<LogisticsAssetRequirement>, pub transport: Vec<ApprovedTransportRef>, } }
144. Hard rule.
145. Logistics Priority
#![allow(unused)] fn main() { pub enum LogisticsPriority { LifeSafetySupport, SecurityCritical, ServiceCritical, Recovery, Standard, } }
146. No User Priority
Hard rule.
147. Spare Deployment
Part 115.
148. Emergency spares must be:
provisioned
firmware-current
attested
compatible
149. Hard rule.
150. Temporary Capacity
May use:
alternate data center
approved cloud region
edge nodes
recovery site
151. Security/residency filters remain.
152. Hard rule.
153. Temporary Site
#![allow(unused)] fn main() { pub struct TemporaryRecoverySite { pub site: PhysicalSiteId, pub allowed_services: BTreeSet<ServiceId>, pub expires_at: Timestamp, } }
154. Temporary Means Time-Bounded
Hard rule.
155. No Permanent Emergency Infrastructure By Accident
Hard rule.
156. Emergency Networking
Can deploy:
temporary uplinks
satellite
alternate carrier
mesh/DTN
157. Must preserve crypto/authz/privacy.
158. Hard rule.
159. Local Mesh Continuity
SIAR local-first/offline capabilities may continue when WAN unavailable.
160. Good.
161. Hard rule.
162. Emergency Relay
Temporary relay must be enrolled/trusted.
163. No anonymous direct downgrade.
164. Hard rule.
165. Regional Isolation
During broad disaster, federation/local operation may continue.
166. Hard rule.
167. Disaster Supply Chain
Approved emergency vendors.
168. No unknown supplier bypass for high-trust hardware.
169. Hard rule.
170. Emergency Procurement
Can be expedited.
171. Still requires minimum provenance/security.
172. Hard rule.
173. Emergency Fuel Logistics
Facility responsibility.
174. SIAR tracks coarse readiness only.
175. No vehicle/worker tracking baseline.
176. Hard rule.
177. Disaster Documentation
Capture:
hazard
state transitions
technical actions
asset movement
recovery evidence
178. No private communications/content.
179. Hard rule.
180. Disaster Evidence Bundle
#![allow(unused)] fn main() { pub struct DisasterEvidenceBundle { pub event: HazardEventId, pub site: PhysicalSiteId, pub state_transitions_digest: Digest, pub asset_movements_digest: Digest, pub recovery_digest: Option<Digest>, } }
181. Signed where needed.
182. Hard rule.
183. Post-Disaster Recovery
Recovery stages:
site safety clearance
power/cooling restoration
network restoration
sensor validation
hardware inspection
attestation
data integrity checks
controlled service return
184. Hard rule.
185. Site Requalification
#![allow(unused)] fn main() { pub struct SiteRequalification { pub site: PhysicalSiteId, pub physical_safety_ok: bool, pub power_ok: bool, pub cooling_ok: bool, pub network_ok: bool, pub sensor_ok: bool, pub hardware_trust_ok: bool, } }
186. All Mandatory Checks Required
Hard rule.
187. Site Requalification State
#![allow(unused)] fn main() { pub enum SiteRequalificationState { Pending, Partial, Passed, Failed, } }
188. Partial ≠ Passed
Hard rule.
189. Hardware Requalification
Part 115.
190. May require:
firmware validation
measured boot
component replacement
sanitization
191. Hard rule.
192. Data Integrity Verification
Before write traffic resumes:
DB consistency
storage health
replication state
backup state
193. Hard rule.
194. Controlled Return To Service
Phases:
infrastructure only
internal service
canary
partial production
full production
195. Part 107/108 integration.
196. Hard rule.
197. No Instant Full Re-Admission
Hard rule.
198. Recovery Soak
Site may operate in monitored recovery state.
199. Hard rule.
200. Disaster Recovery vs Physical Recovery
Distinct.
201. Service may already be running elsewhere while original site is still under recovery.
202. Hard rule.
203. Failback
Separate governed change.
204. Do not fail back automatically because site power returned.
205. Hard rule.
206. Disaster Severity & Business Continuity
Part 70/100.
207. Catastrophic site loss may trigger long-term continuity plan.
208. Hard rule.
209. Data Residency
Part 103.
210. Temporary recovery location still must be compliant.
211. Hard rule.
212. Geographic Correlation
Part 110.
213. Regional hazards can affect multiple sites.
214. Hard rule.
215. Capacity Forecast
Part 111.
216. Disaster demand scenario includes:
failover load
replacement capacity
recovery workload
217. Hard rule.
218. Performance
Part 112.
219. Degraded/recovery capacity may have lower performance.
220. Must remain within continuity policy.
221. Hard rule.
222. Efficiency/Sustainability
Parts 113–114.
223. During disaster, continuity/safety outrank energy efficiency.
224. Hard rule.
225. Hardware Fleet
Part 115.
226. Emergency spares, replacement, attestation, RMA integrated.
227. Hard rule.
228. Facility Reliability
Part 116.
229. Power/cooling/environment state are primary disaster inputs.
230. Hard rule.
231. Physical Security
Part 117.
232. Custody/tamper/access controls remain active.
233. Hard rule.
234. Desired-State Integration
Part 105.
235. Emergency continuity profiles are pre-signed desired states.
236. No handwritten crisis config baseline.
237. Hard rule.
238. Inventory Integration
Part 106.
239. Disaster scope uses canonical assets/sites.
240. Hard rule.
241. Change Integration
Part 107.
242. Emergency changes can use expedited policy.
243. Hard invariants remain.
244. Hard rule.
245. Release Integration
Part 108.
246. Routine releases freeze during active critical disaster.
247. Security/recovery releases may proceed under emergency path.
248. Hard rule.
249. SLO Integration
Part 109.
250. Disaster may consume error budgets.
251. Reliability objectives remain visible.
252. Hard rule.
253. Organizational Governance
Part 104.
254. Disaster roles/escalation predefined.
255. No ad hoc permanent authority.
256. Hard rule.
257. Incident Response
Part 96.
258. Major physical disaster is operational incident.
259. Security/tamper may be parallel security incident.
260. Hard rule.
261. SOC Integration
Part 97.
262. Physical/cyber signals may correlate.
263. No person surveillance expansion.
264. Hard rule.
265. Compliance Integration
Part 95.
266. Evidence can include:
drill completion
site requalification
salvage custody
sanitization/destruction
267. Hard rule.
268. Disaster Preparedness API
#![allow(unused)] fn main() { pub trait DisasterPreparednessService { fn readiness( &self, site: PhysicalSiteId, ) -> Result<DisasterReadinessState, DisasterContinuityError>; fn plan( &self, site: PhysicalSiteId, class: PhysicalDisasterClass, ) -> Result<DisasterResponsePlan, DisasterContinuityError>; } }
269. Emergency Coordinator
#![allow(unused)] fn main() { pub trait DisasterCoordinator { fn transition( &self, site: PhysicalSiteId, state: FacilityEmergencyState, ) -> Result<DisasterTransitionReceipt, DisasterContinuityError>; } }
270. Salvage Service
#![allow(unused)] fn main() { pub trait AssetSalvageService { fn assess( &self, asset: HardwareAssetId, ) -> Result<SalvageClass, DisasterContinuityError>; } }
271. Requalification Service
#![allow(unused)] fn main() { pub trait SiteRequalificationService { fn evaluate( &self, site: PhysicalSiteId, ) -> Result<SiteRequalificationState, DisasterContinuityError>; } }
272. No Generic Emergency Shell API
Hard rule.
273. Error Taxonomy
#![allow(unused)] fn main() { pub enum DisasterContinuityError { HazardUnknown, SiteStateUnknown, EvacuationRequired, FailoverUnavailable, RecoverySiteNoncompliant, SalvageUnsafe, CustodyIncomplete, SiteNotRequalified, CapacityInsufficient, ScopeViolation, Unauthorized, Internal, } }
274. Observability
Safe metrics:
site readiness
exercise freshness
hazard state
evacuation state
failover status
salvage state
requalification state
275. Forbidden:
employee movement maps
individual evacuation timing analytics
user location
private content
276. Hard rule.
277. Disaster Continuity SLOs
Examples:
critical site runbook freshness
failover exercise success
spare readiness
site requalification evidence freshness
278. Security SLO
0 disaster recovery using untrusted hardware
0 custody rules silently suspended
0 emergency network path bypassing crypto/privacy
279. Privacy SLO
0 person-level emergency tracking retained beyond necessity
0 user location inferred from facility continuity telemetry
280. Failure Modes
false alarm
simultaneous regional impact
salvage contamination
logistics delay
recovery site unavailable
281. False Alarm
Use controlled rollback to normal.
282. Preserve event evidence.
283. Hard rule.
284. Regional Multi-Site Impact
Do not assume backup site unaffected.
285. Validate independent fault domain.
286. Hard rule.
287. Salvage Contamination
If trust uncertain:
quarantine
destroy
rather than force reuse.
288. Hard rule.
289. Logistics Delay
Use alternate approved supplier/site.
290. No security-provenance bypass.
291. Hard rule.
292. Recovery Site Unavailable
Continue degraded mode within policy.
293. No forbidden jurisdiction fallback.
294. Hard rule.
295. Testing
Need disaster-continuity testkit.
296. Test Scenarios
fire evacuation
flooded rack
earthquake site isolation
regional blackout
temporary recovery site activation
297. Evacuation Test
Life-safety trigger immediately overrides technical availability concerns.
298. Fire Test
Confirmed fire triggers correct site state.
299. Flood Test
Water + power risk isolates affected zone.
300. Seismic Test
Site requires requalification before normal.
301. Failover Test
Only compliant recovery region selected.
302. Capacity Test
Failover target has sufficient reserve.
303. Custody Test
Salvaged asset movement has valid handoff.
304. Salvage Test
Damaged hardware cannot return to Trusted directly.
305. Logistics Test
Emergency spare still requires enrollment/attestation.
306. Temporary Site Test
Recovery site expires/retired after use.
307. Privacy Test
No worker/user movement timeline generated.
308. Recovery Test
Site cannot return until mandatory checks pass.
309. Failback Test
Power restoration alone cannot trigger automatic failback.
310. Fuzzing
Fuzz:
hazard events
emergency state transitions
salvage records
logistics plans
requalification evidence
311. Property Tests
Properties:
site can never transition from Evacuated directly to Normal
unrequalified salvaged hardware can never become Trusted
recovery site outside residency policy can never be selected
human life-safety evacuation can never be blocked by service availability policy
312. Formal Verification Targets
Strong candidates:
facility emergency state machine
evacuation/failover ordering
salvage trust restoration
site requalification
313. Kani Candidate
state-transition and requalification invariants.
314. TLA+ Candidate
hazard → evacuation → failover → recovery → requalification → failback.
315. Loom Candidate
concurrent hazard signal + failover + site-state transition.
316. Performance
Disaster coordination is control-plane work.
317. Local site safety actions must operate during WAN loss.
318. Hard rule.
319. Storage
Separate:
hazard events
disaster plans
site emergency states
evacuation records
salvage assessments
logistics plans
requalification evidence
320. No workforce tracking warehouse.
321. Hard rule.
322. Partitioning
By:
site
region
hazard class
asset
recovery site
323. No user/person partition.
324. Hard rule.
325. Crate Layout
Recommended:
crates/
├── siar-disaster-core/
├── siar-hazard-detection/
├── siar-site-evacuation/
├── siar-emergency-failover/
├── siar-asset-salvage/
├── siar-emergency-logistics/
├── siar-site-requalification/
├── siar-disaster-exercises/
├── siar-disaster-observability/
└── siar-disaster-testkit/
326. siar-disaster-core
Owns:
PhysicalDisasterClass
DisasterSeverity
FacilityEmergencyState
errors
327. siar-hazard-detection
Hazard event normalization/evidence/confidence.
328. siar-site-evacuation
Human-safety-aware technical evacuation state.
329. siar-emergency-failover
Compliant target selection/failover execution plans.
330. siar-asset-salvage
Damage assessment/quarantine/requalification.
331. siar-emergency-logistics
Spare/replacement/temporary-site planning.
332. siar-site-requalification
Power/cooling/network/sensor/hardware trust verification.
333. siar-disaster-exercises
Tabletop/simulation/failover drills.
334. siar-disaster-observability
Aggregate continuity health only.
335. siar-disaster-testkit
fire/flood/seismic/failover/privacy tests.
336. Security, Privacy & Correctness Invariants
Mandatory:
1. Human life safety and emergency egress always take precedence over service availability, equipment preservation, and technical continuity; no system policy may delay required evacuation.
2. Disaster state, evacuation, failover, shutdown, salvage, recovery, and requalification are distinct explicit states; a site or asset never returns directly from disaster exposure to trusted normal operation.
3. Emergency failover may use only regions/sites that already satisfy security, privacy, residency, trust, and minimum capacity requirements; crisis conditions never authorize silent policy weakening.
4. Damaged, water-exposed, smoke-exposed, tampered, relocated, or otherwise physically exposed hardware is quarantined until inspection, custody validation, firmware/boot verification, and re-attestation or destruction are complete.
5. Chain-of-custody, sanitization, and tamper rules remain active during disasters; emergency logistics may streamline approval timing but cannot make asset movement untracked.
6. Temporary recovery sites, emergency relays, replacement nodes, spares, and offline infrastructure remain signed/enrolled/attested and time-bounded and cannot become permanent ungoverned infrastructure.
7. Disaster preparedness and recovery explicitly model correlated regional failure, power/cooling/network dependencies, failover capacity, and recovery-site independence rather than assuming backup infrastructure is unaffected.
8. Physical-disaster telemetry, drills, evacuation records, and logistics evidence are scoped to sites/assets/technical actions and cannot become employee movement analytics, user-location tracking, or workforce-performance scoring.
9. Routine releases and risky maintenance are frozen during critical facility disasters unless required for security, recovery, or incident containment under the emergency change policy.
10. Site requalification requires verified physical safety, power, cooling, network, sensor, hardware-trust, and data-integrity checks; power restoration or building re-entry alone never restores full production trust.
11. Disaster continuity preserves encryption, authorization, anonymity, federation trust, tenant isolation, and data-residency guarantees even in degraded local/offline or temporary networking modes.
12. Physical-disaster continuity integrates with DR, resilience, capacity, SLOs, hardware fleet, facility reliability, physical security, desired state, inventory, change/release governance, incident response, SOC, compliance, and sustainability without creating an emergency bypass around platform trust.
337. Initial Production Scope
Implement first:
typed PhysicalDisasterClass/DisasterSeverity
hazard scope/confidence model
facility emergency state machine
fire/flood/seismic/severe-weather response profiles
technical evacuation plans
precomputed drain/shutdown order
emergency failover target validation
site isolation
disaster role model
preparedness/readiness state
tabletop/failover exercise framework
asset salvage state machine
salvage custody integration
temporary recovery site model
emergency spare/logistics plans
site requalification checks
controlled service return
failback as separate governed change
privacy-safe disaster dashboards
disaster-continuity testkit
Then add:
regional hazard data adapters
advanced seismic/environmental modeling
logistics lead-time forecasting
automated temporary-site readiness validation
salvage laboratory workflow
formal evacuation/failover verification
cross-region disaster simulation
338. Definition of Done
Part 118 is complete when:
- disaster classes/severity/scope are typed;
- human safety precedence is explicit;
- evacuation/failover/shutdown are separate;
- fire/flood/earthquake response profiles exist;
- failover targets must remain compliant;
- damaged hardware is quarantined before reuse;
- salvage preserves custody;
- emergency spares still require trust establishment;
- temporary recovery sites are time-bounded;
- recovery is staged;
- site requalification is mandatory;
- failback is separately governed;
- no workforce/user tracking is created;
- disaster/privacy/fuzz/formal tests are specified.
339. Final Architecture
PHYSICAL HAZARD
│
▼
HAZARD EVALUATION
│
┌────────┼────────┐
│ │ │
LOCAL SITE REGIONAL
│ │ │
└────────┼────────┘
▼
EMERGENCY STATE
│
┌───────────┼───────────┐
│ │ │
EVACUATE FAILOVER SHUTDOWN
│ │ │
└───────────┼───────────┘
▼
SALVAGE / REBUILD
│
▼
SITE REQUALIFICATION
│
▼
CONTROLLED RETURN
Disaster-continuity safety model:
human safety first
+
precomputed evacuation/failover
+
compliant recovery sites
+
quarantine after physical exposure
+
custody-preserving salvage
+
trusted emergency logistics
+
site requalification
+
privacy-minimized continuity evidence
not:
keep staff inside to save uptime, move workloads to any available region, trust wet or tampered hardware after power-up, and suspend custody rules because it is an emergency
340. Final Principle
A physical disaster should force the system into a safer, more explicit state—not into improvised exceptions.
The correct model is:
protect people first
+
detect and classify hazards
+
evacuate and fail over deliberately
+
preserve integrity and custody
+
quarantine exposed assets
+
restore capacity through trusted logistics
+
requalify the site before return
+
never use emergency operations as justification for surveillance or security bypass
This architecture gives SIAR a privacy-preserving physical-continuity foundation for fire, flood, earthquake, severe weather, site evacuation, emergency shutdown, failover, asset salvage, emergency logistics, temporary recovery infrastructure, site requalification, and controlled return to service while preserving the anonymity, local-first, least-authority, hardware-trust, facility-security, resilience, and anti-surveillance guarantees established across Parts 34–117.